Home Forums General Discussion Work on canopy above back door communal entrance to Block 4 Re: Re: Work on canopy above back door communal entrance to Block 4

#876
imported_post
Moderator

Two jobs tasked for the canopies. 

To make holes to allow rain to fall on the flower beds below.

To repair the central guttering to prevent leaks and to hook up water butts to the downpipes.

All canopies are due to have this done.