      Does anyone know what this work is for, and whether similar work will be carried out to the canopies over the back doors of the other blocks?

    • #876
      imported_post
      Moderator

      Two jobs tasked for the canopies. 

      To make holes to allow rain to fall on the flower beds below.

      To repair the central guttering to prevent leaks and to hook up water butts to the downpipes.

      All canopies are due to have this done.